Projects

 

Project Phases

Ongoing Projects:

Project Maps

The Project
The Projects department has the ultimate responsibility for the development of the Muscat Wastewater Scheme Project within the overall time frame, budget, in compliance with the preset quality standards and supervision of the overall development process.

Master Plan
The Muscat Wastewater Master Plan is a portion of the Muscat Wastewater Scheme Project. The Muscat Wastewater Scheme Project consists of planning, design and construction of needed wastewater infrastructure for the Muscat Governorate. The overall objective of the planning phase is to prepare a document that becomes the plan for the systematic implementation of wastewater infrastructure improvement projects. Overall development plan is divided into 3 phases and it is planned to serve 80% of Muscat population by the end of year 2014 and 90% by 2017.

Project Phases
 
Phase I: Up to December 2005
I.A.1

Al Ansab STP (Phase 1)

II.A.2

Bausher Network Collection System

II.B

Darsayt STP Upgrade

II.C

Darsayt Network Extension (Phase 1)

II.D

Rehabilitation of Existing STP’s

Shattie Al Qurum Debottlenecking

 

Phase-II: 2004-2012

 

Quriyat Interim Wastewater Facility

II.A+IIIE

Ansab – 1&4 (Wadikabir,Hamriyah, Seafront development, Wattayah & Mina Al Fahal Collection System )

II.B

Al Ansab Sludge Compositing Facility

II.B.B

OWSC Head Quarter Building

II.C.1

As Seeb STP (Phase 1)

II.C.2

As Seeb Collection System (Phase 1)

II.D

As Seeb Collection System (Phase 2)

II.E.1+E3

Al Amerat STP (Phase 1&2)

II.E.2

Amerat Collection System (Phase 1)

II.F.1

Quriyat STP (Phase 1)

II.F.2

Quriyat Collection System

II.F.3

Quriyat STP (Phase 2)

II.G.1

New Darsayt STP (Phase 1)

II.G.2

Darsayt Collection System (Phase 2)

 
Phase-III 2008 - 2017
III.A.1

As Seeb STP (Phase 2)

III.A.2

As Seeb Collection System (Phase 3)

III.B.1

Al Bustan STP (Phase 1)

III.B.2

Al Bustan Collection System

III.B.3

Al Bustan STP (Phase 2)

III.C.1

Al Ansab STP (Phase 2)

III.D

New Darsayt STP (Phase 2)

III.F

As Seeb Collection System (Phase 4)

III.G

Amerat Collection System (Phase 2)

III.H

Al Ansab Collection System (Phase 5)

III.J.1

Al Hajir STP

III.J.2

Al Hajir Collection System

III.J

As Seeb Collection System (Phase 5)

 

Ongoing Projects:

Bausher Sewerage Collection Network and Construction of Sewage Treatment Plant at Al Ansab

This project started in April 2003 with the design work for the sewerage network and treatment plant. It covers all of Bausher area and consists of building a new sewerage treatment plant at Al-Ansab, and a sewerage collection network starting at Hamryah Roundabout and all the way to Azaibah.

Due to the size of this project, it is divided into two contracts; one for the STP and the other one for the sewerage collection network, pumping stations, raising mains and irrigation network. The design & supervision consultant for both the contracts are M/s. Khatib and Alami with Metcalf & Eddy.


Sewerage Network:

The construction contract of sewerage network collection system in Bausher is awarded to M/s. Sino Hydro Corporation, China for RO. 57.8 million after a very thorough tendering process. The Construction Contractor (Sino Hydro) has established its office in Muscat and in the process of completing Mobilization.

The new Sewerage Network is approximately 300km long and will connect 17000-18000 houses / buildings on project completion. The scope covers building of the sewerage collection network, including house connections, one small pumping station in Al-Qurum, one main pumping station in Azaibah North, manhole lift station in different areas in Al-Qurum, rising mains from Azaibah PS to Al-Ansab STP and Treated Effluent Network for irrigation purposes in the area. It also includes all electrical works at the pumping stations and control & automations work.

Al-Ansab STP:

This part involves building a new sewerage treatment plant adjacent to the existing STP. The STP is designed to handle 53,000 m3/day of sewerage.

Due to the size of this plant and the fact that it will be the monitoring center, Distributed Control System (DCS) and Supervisory control and Data Acquisition system (SCADA) will be installed to control & monitor all the remote stations / facilities; build operation center which covers offices, warehouse & staff accommodation with all related facilities which will enable the operator to monitor and supervise the entire process.

Al-Ansab plant is based on using the Membrane Bioreactor (MBR) Technology which is considered as one of the leading technologies in the Industry. Once commissioned, Al-Ansab plant will be the largest of its kind worldwide using the MBR technology. The plant capacity is 53,000 m3/day.

The Contractor, M/s. Galfar Engineering & Contracting Co. LLC has started the construction activities.

Darsait STP Upgrade:

The up-grading works of Darsait STP is nearly completed. This major rehabilitation project was carried out to replace the ageing equipments with more efficient ones and to rehabilitate the main process structures.
The upgraded plant capacity is 21,000 m3/day compared to 14,000 m3/day earlier.

M/s. Khatib & Alami with Metcalf & Eddy and Bahwan Contracting Company are the Design & Supervision Consultants and Construction Contractor for this project respectively.

Darsait Network Extension:

The design phase of project started in April 2004 and completed by October 2004, and the Construction works planned to begin by February 2005 and anticipated to be completed by December 2005.

The extension of Darsait Network is required to provide wastewater collection services to Darsait Coastal area. The new flow will fill up the extra capacity of Darsait STP generated by the rehabilitation project of the plant. A construction tender has been floated through the Tender Board and the evaluation of bids is ongoing. M/s. Energoprojekt Entel LLC is the Design & Supervision Consultant for this project.

Rehabilitation of Existing STP’s:

This project is for the Rehabilitation of STP’s in Al Khod, Al Ansab, Shattie Al-Qurum & Ma’abailah due to the deteriorating conditions of these Plants.

The design phase of project started in the beginning of April 2004 and completed by December 2004, and the Construction works will begin in May 2005 and anticipated completion is planned by February 2006. The Construction Tender has been floated on 25 December 2004 and last date for receiving completed bids is 14 February 2005. M/s. Energoprojekt Entel LLC is the Design & Supervision Consultant for the above project.

A’seeb Project:

A’seeb Wastewater Project is intended to provide the residents of A’seeb with a complete new Wastewater Network (gravity sewers, pumping stations and rising mains) that will convey the collected wastewater to new wastewater treatment plant/plants where the wastewater will be treated to a degree that will make it safe for further disposal/utilization. A network of irrigation pipelines will also be provided in A’seeb area to distribute the treated wastewater to be utilized for irrigation purposes. All the existing properties within the catchment boundaries will be connected to the new sewer network and the existing septic tanks will be decommissioned.

Twelve pre-qualified tenderers were invited for the Design & Supervision Consultancy tender. The consultancy bids are currently under evaluation.

 